All-inclusive packages. No hidden costs. Finance available on orders over £5,000.
Perfect entry into contrast therapy
Our most popular setup
Zero compromise luxury
Our experts assess your garden and provide design recommendations
We handle all planning permission requirements
Professional team installs everything, turnkey ready
MCS-certified solar setup for off-grid operation
Learn optimal usage protocols and maintenance
Dedicated support team for life of installation
Calculate your exact solar system requirements and long-term savings for your Scottish contrast therapy setup.
Payback Period
29.8 years
20-Year Savings
£-8,717
Note: Calculations assume £0.28/kWh electricity cost (2026 Scotland average), 3.5 peak sun hours daily average in Scotland, and include battery storage for reliable winter operation. Actual results vary based on location, roof orientation, and weather patterns.
Absolutely. Our 10-20kWh battery systems store enough energy to power 2-4 hours of daily use, even during Scottish winters. We size every system based on your location and usage patterns.
With our solar packages: £0 in electricity. You'll only pay for occasional maintenance (filter changes, wood for wood-burning saunas). Traditional setups cost £100-£300/month to run.
Typically 2-5 days depending on complexity. Solar panels: 1-2 days. Sauna and plunge: 1-2 days. Final connections and testing: 1 day. We coordinate everything for minimal disruption.
Most garden installations under 4m height don't require permission in Scotland, but we assess every site and handle any required applications for you.
Take our 2-minute quiz for a personalized recommendation
Find Your Perfect Setup